Gildan Substation
Project Scope:
This station was constructed to serve a new industrial load as well as existing domestic load in the area. This station is designed to take delivery at 100kV and step down to serve the distribution load. The distribution substation was constructed with two power transformers and eight distribution circuits in a circuit regulation configuration.
Project Details
Project Completion:
2015
Project Location:
Mocksville, NC
Project Description:
100kV Distribution Substation
PROJECT TYPE
Substation
Project Gallery